Licensed solar capacity
INTEGRATED ENERGY INFRASTRUCTURE · GREECE
Hydrogen, solar
and storage.
An advanced integrated-energy development in Domokos, Central Greece, combining licensed solar PV and green-hydrogen production with a planned utility-scale battery system.
Licensed electrolysis
Current BESS design basis
Target annual H₂ output
THE ASSET
A first-mover Greek green-energy platform with a substantial licensed base.
The controlled evidence set includes photovoltaic and hydrogen production certificates, the environmental approval chain for 100 MW electrolysis, the grid application, preliminary layouts and detailed operating work.
Mingyang is the intended technology partner. The sponsor has confirmed progress on bidirectional BESS import and export; the written operator instrument and project-specific commercial schedules remain controlled completion items.
FINANCING CASE
20% target equity return. 30% sponsor equity. 70% bank financing.
Commercial target
The optimised planning case reaches approximately 20.1% modelled equity IRR without capital-grant dependency.
Capital structure
Thirty percent sponsor equity and seventy percent senior bank financing form the current target basis.
Additional upside
KfW or comparable support is pursued in parallel as upside and is not a condition of the commercial case.
PROJECT-RIGHTS ACQUISITION
A controlled route from project-rights acquisition to bank financing.
The proposed transaction gives a qualified investor a documented platform for acquiring, financing and delivering Mantasia. Final scope, price, conditions precedent and transfer mechanics are agreed in definitive transaction documents after confirmatory due diligence.
Acquisition perimeter
Project-company and rights structure, licences, applications, studies, technical work product, land and water positions, grid correspondence, data and assignable contracts—each identified in a definitive asset and rights schedule.
Confirmatory diligence
Legal title and transferability, permit validity, land and water rights, bidirectional grid conditions, tax, sanctions, litigation, technology interfaces and environmental compliance are confirmed against primary evidence.
Financing bridge
The integrated model, bank case, sensitivities, EPC/OEM package, offtake strategy, insurance and security concept are converted into lender-ready workstreams with named owners and closing dates.
Controlled closing
Exclusivity, deposit protection, conditions precedent, price adjustment, representations, long-stop date, step-in rights and handover deliverables protect both buyer and seller through financial close.
Executive financing memorandum, evidence index, configuration basis, integrated financial model, rights and licence evidence, technical packages, transaction drafts and a live open-items register. Independent adviser reports and binding third-party instruments are added as they are completed.
BANKING DISCIPLINE
Advanced development with a controlled route to financing close.
Core approvals and technical basis
PV and hydrogen production certificates and the environmental approval chain are present in the controlled evidence set.
Bidirectional grid development
The sponsor confirms the latest grid progress; formal written evidence is being incorporated into the transaction record.
Commercial implementation
Offtake, project-specific OEM/EPC/LTSA terms, land and water completion, insurance and finance documents are the principal closing workstreams.
CONTROLLED DISCLOSURE
Qualified counterparties can request Data Room access.
The confidential portal remains on the Ultimate Partners development system until its independent security and access-control deployment is completed.